A total of 510 employees will be laid-off beginning in January, the result of two separate actions linked to production and inventory concerns.
According to Automotive News , the majority — 350 employees — come from the Lansing Grand River Assembly plant in Lansing, Mich., where the Cadillac ATS and CTS are assembled. The cut comes from the loss of a second shift at the plant, a planned cut in production as part of Cadillac president Johan de Nysschen’s promise to make his brand more exclusive, and to allow excess inventory to be sold off.
A second shift is expected to return when GM begins production of the next-gen Chevrolet Camaro — based upon the same platform underpinning the two Cadillacs — between the end of 2015 and the start of 2016. In the meantime, GM plans to relocate some of the 350 to one of its two nearby plants.
Closer to Detroit, Detroit Free Press says the remaining 160 employees at Lake Orion Assembly in Orion Township, Mich. will have their positions permanently phased-out starting in January. The plant is slowing down production of the Buick Verano and Chevrolet Sonic to meet projected sales. Representative Chris Bonelli says the process will conclude by the end of 2015, but the number of workers ultimately laid-off “could be reduced by planned retirements and general attrition.”
The post GM To Lay Off 510 Employees In Two Separate Actions appeared first on The Truth About Cars.
Best Deals today in www.freepromotoday.com